问题 |
E3S网页汇编
卷积3292021
4线程绿色能源和可持续发展问题国际会议 |
|
---|---|---|
文章号 | 01048 | |
页数 | 4 | |
多尔市 | https://doi.org/10.1051/e3sconf/202132901048 | |
在线发布 | 2021年12月9日 |
计算高水割阶段联合水库中合理流水量法
一号新疆油田探索开发学院
2探索开发研究所Daqing油田,Daqing 163712
In view of the problem that water cut rises quickly in conglomerate reservoirs with high water cut, based on the variation law of reservoir water injection and liquid production characteristics, a method for determining the maximum liquid production scale in conglomerate reservoirs with high water cut is established by using reservoir engineering and field statistics.Considering the maximum liquid production capacity at the well end, the maximum injection capacity at the well end and the injecting-production ratio limit to keep the formation energy, a method to determine the maximum liquid production scale in conglomerate reservoir is established to keep the formation energy sufficient.This method ensures that the injection and production ends of the reservoir are coordinated and matched, and the formation energy is sufficient, so that the reservoir development keeps a benign cycle.The research method and conclusion have important reference value and significance for theoretical research and practical application of ultra-high water cut oilfield development.
关键字 :高水割/注入生成协调/液取尺度
必威西汉姆赞助2021年EDP科学出版
开存文章分发创用CC授权4.0允许在任何介质上不受限制使用、分发和复制,只要原创作品正确引用
当前用法度量显示文章视图累积计数(全文文章视图包括HTML视图、PDF和ePub下载,根据可用数据)和Vision4Press平台摘要视图
数据对应2015年后板状使用当前使用量度自在线发布后48-96小时提供并按周日每日更新
初始下载度量器可能花点时间